Berth 32/33 Wharf Rehabilitation
Port of Oakland, CA
Silverado removed 1,500 lineal feet of concrete crane rail at the face of the Berth 32/33 wharf.
Additionally, Silverado demolished the former Long Shoreman's building and performed land side demolition for the installation of the new rear crane rail. Over 1,000 feet of the old crane rails were removed.