PG&E - Humboldt Bay Power Plant
Eureka, CA
Silverado performed the dismantlement of Fossil Units 1 and 2 for PG&E at their Humboldt Bay Nuclear Power Plant located in Eureka, California.
Silverado's full service contract took the plant from fully operating through the cold and dark process, abatement and cleaning of all hazardous materials and oils, dismantlement of all structures, final site cleanup, and grading operations. Included in the scope of work was the complete removal of the three million gallon liquid fuel tank, system, and associated piping.
In addition Silverado was able to facilitate for the client a beneficial asset recovery program. Silverado completed the complex project ahead of schedule and with over 50,000 man hours expended had not a single accident or even a first aid incident. All work was performed directly adjacent to the Unit 3 Nuclear Reactor, which required daily coordination with the Nuclear decommissioning team at this high-level secured site.