WETA Pier 2 - Ferry Terminal
San Francisco, CA
Silverado Contractors was subcontracted for the demolition and removal of Pier 2 existing concrete pier, timber pier, marine piles, and associated. The marine removal work consisted of providing the labor, tools, equipment, supplies, and materials necessary to remove, transport, and dispose of the demolition debris. The concrete piles consisted of various sizes and lengths. The woodpiles consisted of concrete jacketed piles and plain timber piles.